Railway tracks in Balochistan
New railway tracks in Balochistan Feasibility report to be completed.
A detailed briefing on new railways tracks in Balochistan under the umbrella of CPEC for linking Gwadar with Mastung via Basima (960km) and Basima with Jacobabad through Khuzdar (300km). Linking Gwadar with Mastung (960km) and Basima with Jacobabad via Khuzdar (300km) is a long-term project envisaged for 2025-2030.
In this regard, a feasibility study of both the routes is being conducted. The study is at advanced stages. Upon completion of the feasibility study, PC-Is will be prepared for approval from the competent forum.